Quick Summary: This Puducherry scheme grants a 25% subsidy on constructing buildings of 50,000 sq.ft. or more (or 5,000 sq.ft. for bio-tech self-use), with ceilings up to ₹1,00,00,000, to support IT and bio-technology infrastructure.

About “Infrastructure Subsidy” under “Motivation of Entrepreneurs to Start Industries and Fiscal Assistance to Industries”

The “Infrastructure Subsidy” component of the “Motivation of Entrepreneurs to Start Industries and Fiscal Assistance to Industries” Scheme, run by the Industries and Commerce Department, Union Territory of Puducherry, offers a 25% subsidy to industrial units that invest in buildings of at least 50,000 sq. ft. constructed area. Applications are accepted offline through the prescribed form on the department’s official website.

Scheme Overview

Government Level

State Government

Eligible Entity

Business Entity

Scheme Details

Eligibility

Eligibility Requirements

To qualify for "Infrastructure Subsidy" under "Motivation of Entrepreneurs to Start Industries and Fiscal Assistance to Industries", applicants must satisfy the following conditions:

💰

The applicant should be an infrastructure developer who…

The applicant should be an infrastructure developer who has invested in a building of at least 50,000 sq. ft. constructed area, meant for leasing to IT industries. OR The applicant should be an industrial unit investing in constructing a factory building of no less than 50,000 sq.ft. to set up IT industries. OR The applicant should be an infrastructure developer who has invested in a building of at least 50,000 sq. ft. constructed area, meant for leasing to bio-technology industries. OR The applicant should be a bio-technology industry unit that has invested in a building of at least 5,000 sq. ft. for self-occupation. Only investments in buildings made on or after 31-7-2006 qualify for this subsidy. For this scheme, "IT industries" refers to manufacturers of computer systems, Software/Information Technology Enabled Services (ITES), Business Process Outsourcing (BPO), and Knowledge Process Outsourcing (KPO).

Applicants must meet all of the above conditions to be considered eligible for this scheme.
Benefits

Benefits Provided

"Infrastructure Subsidy" under "Motivation of Entrepreneurs to Start Industries and Fiscal Assistance to Industries" provides the following benefits to eligible applicants:

💰

A 25% subsidy, capped at ₹1,00,00,000/-, for infrastructure…

A 25% subsidy, capped at ₹1,00,00,000/-, for infrastructure developers investing in a building of at least 50,000 sq. ft. constructed area for leasing to IT industries.

💰

A 25% subsidy, capped at ₹1,00,00,000/-, for industrial…

A 25% subsidy, capped at ₹1,00,00,000/-, for industrial units investing in constructing a factory building of no less than 50,000 sq.ft. to set up IT industries.

💰

A 25% subsidy, capped at ₹1,00,00,000/-, for infrastructure…

A 25% subsidy, capped at ₹1,00,00,000/-, for infrastructure developers investing in a building of at least 50,000 sq. ft. constructed area for leasing to bio-technology industries.

💰

A 25% subsidy, capped at ₹50,00,000/-, for bio-technology…

A 25% subsidy, capped at ₹50,00,000/-, for bio-technology industry units investing in a building of at least 5,000 sq. ft. for self-occupation. Number of Installments The subsidy is disbursed annually, in installments not exceeding ₹25,00,000/- per year, until the full eligible amount is paid.

Benefit amounts and conditions may vary by category — refer to the official scheme guidelines for exact figures applicable to your case.
Documents Required

Documents Required

Applicants should keep the following documents ready before starting the application:

📄

Entrepreneurs Memorandum Part-2 (UAM/ PMT) registration or Commencement…

Entrepreneurs Memorandum Part-2 (UAM/ PMT) registration or Commencement of Production Certificate.

📄

Caste certificate issued by the competent authority, for…

Caste certificate issued by the competent authority, for Scheduled Caste/Scheduled Tribe (SC/ST) entrepreneurs.

✅

Sanction letter for the loan

Sanction letter for the loan.

📄

Registered document of the land

Registered document of the land.

✅

Approval of plans from the Pollution Control Board…

Approval of plans from the Pollution Control Board (PPA).

📄

Certificate from an engineer valuing the building, assessed…

Certificate from an engineer valuing the building, assessed by the Public Works Department (PWD) or Pondicherry Industrial Promotion Development and Investment Corporation (PIPDIC).

✅

Registered lease agreement between the developer and the…

Registered lease agreement between the developer and the unit for the building.

✅

Invoices for the purchase of plant & machinery/pollution…

Invoices for the purchase of plant & machinery/pollution control equipment/generator.

📄

Chartered Accountant's certificate covering investment in fixed assets/pollution…

Chartered Accountant's certificate covering investment in fixed assets/pollution control equipment/generator.

📄

Certificate confirming installation of pollution control equipment, from…

Certificate confirming installation of pollution control equipment, from the Directorate of Sustainable Technologies and Environment (DSTE).

✅

Air and water consent orders from DSTE

Air and water consent orders from DSTE.

✅

Affidavit notarized by a notary public

Affidavit notarized by a notary public.

Ensure all documents are valid and, where required, duly attested before submitting your application.

How to Apply

Offline Application

Applicants can apply for "Infrastructure Subsidy" under "Motivation of Entrepreneurs to Start Industries and Fiscal Assistance to Industries" through the offline application process outlined below.

1️⃣

Register the claim for the incentive/subsidy through the…

Register the claim for the incentive/subsidy through the prescribed form on the official website of the Directorate of Industries and Commerce, Puducherry.

2️⃣

Fill in all mandatory fields on the form…

Fill in all mandatory fields on the form and attach self-attested copies of the required documents where necessary.

3️⃣

Submit the completed, signed form along with the…

Submit the completed, signed form along with the documents to the concerned authority.

4️⃣

Obtain a receipt or acknowledgment from the office…

Obtain a receipt or acknowledgment from the office that received the form, confirming the date, time of submission, and a unique identification number where applicable. *The State Level Committee reviews each case on its merits to determine whether the unit is entitled to the incentive/subsidy. Application Deadline For New Units The application must be submitted within one year of obtaining the Entrepreneurs Memorandum Part-2, Permanent Registration, or Commencement of Production Certificate. For Existing Units The application must be submitted within one year of completing the expansion, diversification, or modernization.

Ensure all required documents are ready before starting the application process.

Official Application & Website

Verify the latest eligibility, dates and instructions before applying.

Official Sources & References