Sarkari Yojana
Coffee Development Programme in North Eastern Region: Water Augmentation
About Coffee Development Programme in North Eastern Region: Water Augmentation
This Water Augmentation component operates under the Coffee Board’s “Integrated Coffee Development Project During the Medium Term Framework (MTF) Period: Development Support to Stakeholders” (Department of Commerce, Ministry of Commerce and Industry). It works to lift coffee productivity and quality by helping growers build water-augmentation infrastructure for irrigation and wet processing.
Scheme Overview
Central Government
Ministry Of Commerce And Industry
Individual
Scheme Details
Eligibility Requirements
To qualify for Coffee Development Programme in North Eastern Region: Water Augmentation, applicants must satisfy the following conditions:
The applicant must be a tribal grower
The applicant must be a tribal grower.
The applicant must not have already claimed a…
The applicant must not have already claimed a Water Augmentation subsidy during the XII Plan period.
Land records must be registered in the beneficiary's…
Land records must be registered in the beneficiary's name.
These records need certification from the Village Authority/State…
These records need certification from the Village Authority/State Government/Competent Authority.
Eligible Activities
Setting up a water storage tank, open well, and irrigation equipment (sprinkler/drip) to boost production, productivity, and quality.
Location Specifications
The water storage tank can sit above or below ground level.
Water augmentation structures must be located on the estate or nearby.
Benefits Provided
Coffee Development Programme in North Eastern Region: Water Augmentation provides the following benefits to eligible applicants:
Subsidy Details
Water harvesting structures and sprinkler units qualify for…
Water harvesting structures and sprinkler units qualify for a subsidy of 75% of unit cost, capped overall at ₹1,25,000 across all related activities combined.
For below-ground water storage tanks, the subsidy is…
For below-ground water storage tanks, the subsidy is calculated on whichever is lower between the dimension-based cost and the unit cost set for that holding size.
For above-ground tanks, it's calculated on whichever is…
For above-ground tanks, it's calculated on whichever is lower between the actual cost and the unit cost fixed for the equivalent below-ground tank. Subsidy Availability Growers may claim subsidies for water harvesting structures and irrigation equipment together or separately, at different times. Unit Cost and Subsidy for Water Harvesting Structures Size of HoldingDimension of Water Harvesting StructureTotal Unit Cost (₹)Subsidy AmountUp to 2 Ha.30' x 30' x 10' (9000 Cft.)₹43,000.0075% of Unit Cost2 Ha to 4 Ha & above43' x 43' x 10' (18490 Cft.)₹89,000.0075% of Unit CostUnit Cost and Subsidy for Sprinkler/Drip Unit Size of HoldingTotal Unit Cost (₹)Subsidy AmountUp to 1.00 Ha. ₹60,000 75% of the Unit Cost1.00 to 2.00 Ha. & above ₹1,20,000 75% of the Unit Cost
Documents Required
Applicants should keep the following documents ready before starting the application:
Application in the prescribed format, submitted in duplicate
Application in the prescribed format, submitted in duplicate.
Original invoice/bill bearing the TIN number, for sprinkler/drip…
Original invoice/bill bearing the TIN number, for sprinkler/drip equipment.
Work-completion report and expenditure statement, signed by the…
Work-completion report and expenditure statement, signed by the applicant.
How to Apply
Offline Application
Applicants can apply for Coffee Development Programme in North Eastern Region: Water Augmentation through the offline application process outlined below.
Procedure for Claiming Subsidy
Submission of Required Documents Once the relevant activity…
Submission of Required Documents Once the relevant activity is complete, the beneficiary/applicant files the necessary documents in the prescribed format.
Document Scrutiny and Field Inspection The Extension Officer…
Document Scrutiny and Field Inspection The Extension Officer examines the documents and carries out a field inspection, then forwards the application, the physical verification report, and all related documents to the concerned Joint Director (Extension) or Deputy Director (Extension), recommending either subsidy release or rejection.
Review and Recommendation by Joint Director / Deputy…
Review and Recommendation by Joint Director / Deputy Director The Joint Director (Extension) or Deputy Director (Extension) carefully reviews the documents to confirm the claim's admissibility, then works out and approves the applicable subsidy.
Release of Subsidy Once satisfied the claim is…
Release of Subsidy Once satisfied the claim is admissible, the Joint Director (Extension) or Deputy Director (Extension) arranges to release the eligible subsidy to the beneficiary via Electronic Fund Transfer (EFT).
Official Application & Website
Verify the latest eligibility, dates and instructions before applying.
