Phase-II Of The Grid Connected Rooftop Solar Programme

Jammu and Kashmir
Quick Summary: Phase-II of MNRE's Grid Connected Rooftop Solar Programme, run through JAKEDA in Jammu & Kashmir, subsidizes residential rooftop solar installations by 40% for 1-3 KW systems and 20% above that, applied for entirely online via the National Portal for Rooftop Solar. It aims to add thousands of megawatts of rooftop solar capacity while positioning DISCOMs as key drivers of deployment.

About Phase-II Of The Grid Connected Rooftop Solar Programme

Phase-II of the Grid Connected Rooftop Solar Programme has been introduced by the Ministry of New & Renewable Energy (MNRE), Government of India, with the Jammu & Kashmir Energy Development Agency (JAKEDA) acting as the nodal agency in the Union Territory of Jammu & Kashmir, targeting a combined capacity of 220MW under the 20MW Residential Scheme and the 200 MW Jammu Solar City “Solar City Mission.” Objectives: The programme’s key objectives are:

1. Promoting grid-connected RTS across every consumer segment — residential, institutional, social, government, commercial, industrial, and so on. 1. Positioning DISCOMs as the lead drivers of rapid RTS deployment. 1. Building awareness, capacity, and human resources around rooftop solar. 1. Encouraging sustainable business models. 1. Adding 38000 MW of RTS capacity nationwide by 31.12.2022 — 4000 MW in the residential sector backed by Central Financial Assistance, and 34000 MW across other sectors (Social, Government, educational, PSUs, Statutory/Autonomous bodies, Private Commercial, Industrial Sectors, etc.) through suitable incentives for DISCOMs. 1. Encouraging domestic manufacturing of solar cells and modules.

Scheme Overview

Government Level

Central Government

Ministry

Ministry Of New and Renewable Energy

Implementing Agency

JAKEDA

Launch / Open Date

08 Mar 2019

Closing Date

31 Mar 2026

Scheme Details

Eligibility

Eligibility Requirements

To qualify for Phase-II Of The Grid Connected Rooftop Solar Programme, applicants must satisfy the following conditions:

✅

Residential consumers and Group Housing Societies may apply…

Residential consumers and Group Housing Societies may apply to install a solar rooftop system.

✅

If the electricity connection and bill are in…

If the electricity connection and bill are in your own name, and you have the roof owner's permission to install a rooftop solar system, you are eligible to install an RTS.

Applicants must meet all of the above conditions to be considered eligible for this scheme.
Benefits

Benefits Provided

Phase-II Of The Grid Connected Rooftop Solar Programme provides the following benefits to eligible applicants:

Benefits of Phase II GCRT Scheme:

✅

One single platform to keep track of various…

One single platform to keep track of various Solar PV based plants.

💰

Consumers get a subsidy of 40% for capacities…

Consumers get a subsidy of 40% for capacities of 1-3 KW and 20% for anything above 3Kw.

✅

Consumers can apply without hassle through the “National…

Consumers can apply without hassle through the “National Portal For Rooftop Solar” at http://solarrooftop.gov.in. 1. Consumers only need to pay their Beneficiary Share, and the CFA is disbursed directly to the Empaneled Vendor once Jammu & Kashmir Energy Development Agency (JAKEDA) completes its inspection.

Benefit amounts and conditions may vary by category — refer to the official scheme guidelines for exact figures applicable to your case.
Documents Required

Documents Required

Applicants should keep the following documents ready before starting the application:

✅

1

1. A copy of the most recent electricity bill.

Ensure all documents are valid and, where required, duly attested before submitting your application.
Important Dates

2019-03-08

How to Apply

Online Application

Applicants can apply for Phase-II Of The Grid Connected Rooftop Solar Programme through the online application process outlined below.

Application Portal: Open Application Portal ↗

📋

Application Process

Applicants wanting to install a rooftop solar system under the simplified procedure must apply through the National Portal. Registering on the National Portal requires an active mobile number and e-mail ID, and applicants will also need to download the SANDES app to receive the OTP.

The full process is laid out in the steps below.

Step-1: Download the SANDES app and register on the National Portal, selecting your local Distribution Company or Electricity department (referred to as DISCOM), and entering your Electricity connection number/Consumer number (as shown on the electricity bill), e-mail id and mobile number. Registration involves OTP verification of the mobile number and activation via the email id; the activation-link email will also explain the full procedure.

Step-2: Once registered, applicants can go ahead and submit their application to install a grid connected rooftop solar system at a residential house. Details entered during registration get prefilled into the application form, and applicants then add information such as the name on the electricity bill, address, proposed rooftop solar system capacity, and details of any existing rooftop solar capacity already installed. A copy of the latest electricity bill must also be uploaded. Once submitted, a copy of the application is emailed to the applicant and can also be downloaded after logging into the portal.

Step-3: The application goes to the DISCOM for technical feasibility approval as per prevailing regulations. Applicants are advised to begin installing the rooftop solar system only after DISCOM grants feasibility approval, and the approval or rejection decision is communicated to the applicant through email.

Step-4. Once DISCOM approves feasibility, the applicant can proceed with installation, which must be carried out by a vendor registered/empaneled with DISCOM. The Ministry has specified minimum technical specifications and standards that rooftop solar systems must meet, though applicants may opt for equipment of higher quality/efficiency. Only domestically manufactured solar modules made using domestically manufactured solar cells listed in the ALMM should be used, and the inverter must also be BIS certified. To protect the applicant's interest, an agreement must be signed between the applicant and the vendor — a model format is available on the National Portal under the Help Document section. It is mandatory for the vendor to provide comprehensive maintenance of the installed rooftop solar plant for at least 5 years.

Step-5: After installation is complete, the applicant has to submit project completion details for net-metering and approval — covering wattage, make and number of solar modules, make and wattage of the inverter, name of the vendor that installed the system, photographs of the system, etc. The applicant also has to apply for net-metering; this application will be forwarded to DISCOM, and the applicant has to follow DISCOM's instructions regarding payment of net-metering charges, signing of the net-metering agreement, etc., as applicable.

Step-6: DISCOM officials will install the net-meter and inspect the system for fulfilment of minimum technical specifications and standards.

Step-7: Upon successful inspection and installation of the net-meter, a commissioning certificate will be generated online by DISCOM.

Step-8. The applicant has to submit bank details and upload a copy of a cancelled cheque. The fund handling agency will release the Central Government subsidy directly into the bank account. Details of the Central Government subsidy available under the simplified procedure may be checked on the National Portal.

Note: The applicant shall also check various informative material placed in the Help Document section of the portal for a better understanding of the procedure.

Ensure all required documents are ready before starting the application process.

Objectives

**
The key objectives of the programme are: